Carpenter Quotation & Bill Maker
Wardrobes and cabinets by the square foot, doors and repairs by the piece, plywood and hardware — at your own rates, sent from your phone.
This browser is not keeping what you type (a private window, or its storage is full). Download the PDF before you close the page.
Your business
These details are typed once and stay on this device for every job. The logo is printed on the PDF and the picture.
The headings, the sums, the date and the amount in words are printed in this language. What you type is printed as you typed it.
No lines yet. Tap a job above, or add a line of your own.
Your rate card
Every rate you type on a line is remembered here for this trade, on this device, and filled in the next time you add that line. Change a rate here to change what is filled in from now on.
Nothing yet — rates appear here as you type them on your lines.
This prints a simple bill with the tax as one line. It is not laid out as a formal tax invoice, such as a GST tax invoice. If you are registered for tax, ask your accountant what your invoice must carry.
0 / 800
Tap the paper to see it full size.
When the work is done, turn this quotation into a bill. The lines and rates stay as they are, and you can still change them — for extra work, or for materials at their real cost.
{link} becomes the link to the paper.
See it as your customer will ↗ · The whole paper is inside the link; nothing is stored on a server. The link does not carry your logo — the PDF and the picture do.
Measure each run of wire or pipe and add it here. The sum adds them up, puts your spare allowance on top, and counts the coils or lengths to buy.
What you saw on the visit, room by room. These notes are for you: they print on the Materials list, never on the quotation or the bill.
These sums only add up the sizes you type. They do not choose a wire size, a pipe size, a breaker or a mix — that is your call and your local code's.
No job matches.
Jobs are kept in this browser on this device only. A backup file is the way to move them to another phone, or to keep them safe if the browser's data is cleared.
What a carpenter's quotation lists
This page opens on the Carpenter trade, with 16 common jobs and 15 common materials ready to tap.
| Kind of line | Ready-made lines | Unit it starts with |
|---|---|---|
| Made furniture, by area | Wardrobe, kitchen cabinet, loft or shelf, TV unit, laminate pasting, polish or varnish | sq ft |
| Fitting and making, by the piece | Door, door frame, window, lock, hinge and handle, bed or cot, table, curtain rod | nos |
| Repairs | Furniture repair | job |
| Day work | Carpenter day work | day |
| Materials | Plywood in three thicknesses, block board, laminate, edge banding, hardwood, hinges, drawer channels, handles, locks, adhesive, screws and nails, polish, glass | sheet, m, cu ft, nos, pair, kg, litre, sq ft, lot |
By the square foot, by the piece, or by the day
Wardrobes, kitchen cabinets and lofts are usually priced by the square foot of the front: width times height. Measure, multiply, and put the area as the quantity. Say in the notes how you measured, because a rate that includes the plywood, laminate and hardware is a very different rate from one for labour alone.
If the customer buys the materials, quote labour by the square foot or by the day and send them the Materials paper as the shopping list: it has every material line with its quantity and a box to tick, and no prices. If you supply everything, either fold the materials into your square-foot rate, or add them as lines and let the paper show labour and materials as two subtotals.
Doors, locks and repairs are quoted by the piece. For a repair nobody can size in advance, the day line with your day rate is the honest one.
Lines that are often forgotten
- Hardware. Hinges, channels, handles and locks can cost as much as a sheet of plywood. Count them: the list has each one, with drawer channels by the pair.
- Laminate and edge banding. The inside and the outside may take different laminate. Give each its own line.
- Polish. Polish or varnish work is a separate labour line by the square foot, and the polish itself a material by the litre.
- Changes after cutting. The note “Measurements are taken at the site before cutting. Changes after cutting are charged” is one tap away.
- Other trades. A kitchen needs a plumber and an electrician. “Electrical and plumbing changes are not included” says so.
The advance
Woodwork means buying sheets before a single cut is made, so an advance is normal. Type it under Advance to start work, or tap 50% for half the total, and it prints under the total. When it is paid, add it under Money received — an advance can be recorded before there is a bill — and send the Receipt paper for it.
From the quotation to the bill
When the customer agrees, tap Accepted at the top so the job shows as agreed in Your jobs. When the work is finished, tap Make the bill for this job. The bill takes the next bill number and today's date, and keeps every line, so you can change the area to what was finally built before you send it. Record each payment under Money received; the bill then prints what has been received and the balance due, and the Receipt paper states the amount in figures and in words. The full steps, the worked example of the sums and the ways to send the paper are in the main guide.
How do I quote a wardrobe by the square foot?
Tap Wardrobe making, type the area of the front (width times height) as the quantity and your rate for one square foot as the rate. Write in the notes whether the rate includes plywood, laminate and hardware or is for labour only.
Can I give the customer a list of materials to buy?
Yes. Add the plywood, laminate, hinges and other materials as material lines with their quantities. The Materials paper prints them as a shopping list with tick boxes and no prices, and you can send it as a PDF or a link.
How do I show the advance on the quotation?
Type it under Advance to start work, or tap 50% to fill in half the total. It prints under the total. When the customer pays it, add it under Money received and the Receipt paper is ready to send.
Can I charge by the day instead?
Yes. The line Carpenter day work starts with the unit day. Put the number of days as the quantity and your day rate as the rate.
More tools: GST Calculator · Rent Agreement & Receipt · Experience & Salary Certificate · Unit Converter